Storage at the Distribution Edge: Transformer capacity, commercial economics and project delivery in China

A practical analysis of storage behind and around distribution transformers. The report distinguishes capacity remuneration, customer demand charges and deferred network reinforcement, then connects technical sizing to payment structures, development milestones and investment screening.

Research fieldEnergy Infrastructure & Investment
IndustryDistribution Networks; Battery Energy Storage; Industrial Power Supply
MarketChina
Last updated2026-10

Research scope

  • The Electrical Boundary and the Constraint; Three Different Capacity Values; Technical Sizing and Dispatch Priority; Commercial Structures and the Paying Counterparty; Economic Cases and the Deferral Test; Development From Screening to Operation; Operations, Measurement and Aggregation; Scalability and Investment Outlook

Table of contents

  1. 01Executive Summary
  2. 021. The Electrical Boundary and the Constraint
  3. 032. Three Different Capacity Values
  4. 043. Technical Sizing and Dispatch Priority
  5. 054. Commercial Structures and the Paying Counterparty
  6. 065. Economic Cases and the Deferral Test
  7. 076. Development From Screening to Operation
  8. 087. Operations, Measurement and Aggregation
  9. 098. Scalability and Investment Outlook
  10. 10Decision Annex: Applied Investment Analysis
  11. 11Decision Matrices and Calculation Checks
  12. 12Research Method and References

Public preview

About This Report

A practical analysis of storage behind and around distribution transformers. The report distinguishes capacity remuneration, customer demand charges and deferred network reinforcement, then connects technical sizing to payment structures, development milestones and investment screening.

Selected Key Findings

  • A technical network benefit becomes revenue only through an eligible tariff or an enforceable service agreement.
  • Transformer limits concern apparent power, temperature and duty, not active power alone.
  • Network support and arbitrage must share one state-of-charge budget.
  • Deferral value is a timing benefit and should not be booked as the entire avoided upgrade cost.

Inside the Full Report

The full report includes chapter-based analysis, four original figures, worked examples, decision matrices, an applied investment annex and source references.

SkyStar Advisory Limited. Research cutoff: 21 October 2026. Edition 20261021 v1.

Member research

Continue reading the full report

The complete report is available to active members. Members can read the full member research library online; member research published during the current continuous membership period is also available for PDF download.

Join membership